
Application 03
Polyhouses, prefab & modular homes
Prefab, modular homes & polyhouses are light, but they still need a level base to sit on. We install piles to match the home's frame, which can be directly bolted. This works even on sloping or remote land, with no digging and dependency on local civil contractors. Screw pile can help you build in the remotest of the location with minimal labor.
Pile types used
Modular house single-helix pile · Light-gauge ground screw · Ground screw with single helix
Gallery




Prefab house

Foundation detail

Prefab site

Polyhouse
Technical specification
Sizes for this application.
Dimensions in millimetres. HDG — hot-dip galvanised.
| Pile type | Shaft Ø | Head | Length | Coating |
|---|---|---|---|---|
| Modular house single-helix pile | 76–114 | Bolted bracket | 2000–5000 | HDG |
| Light-gauge ground screw, polyhouse | 60, 76 | U-bracket / tube socket | 1000–1500 | HDG |
| Ground screw with single helix | 76, 89 | Threaded, adjustable | 1500–3000 | HDG |
On site
How it goes in.
01
Position
Set out on the drawing grid.
02
Drive
Turned to design depth.
03
Check
Check it's turned in firmly enough.
04
Load
Structure set the same day.



